Blog

  • Design led manufacturing under Production Linked Incentive (PLI) Scheme for Promoting Telecom and Networking Products Manufacturing in India
  • PLI Scheme amended to facilitate Design-Led Manufacturing with additional incentive rate of 1% over and above existing incentive rates
  • Additional telecom & networking products added in the list of eligible products
  • Telecom PLI Scheme is extended by one year
  • Applications are invited from 21st June 2022 for incentive of more than ₹ 4,000 crores

 

Interested eligible Applicants can start the registration process for the Scheme from 21st June 2022 at https://lnkd.in/gyAR6BT. The Application window shall be open for 30 days i.e. up to 20th July 2022.These applications are invited for the balance fund of more than ₹4000 crores. This will give a boost to manufacturing of telecom and networking products to develop 5G ecosystem for India.

 

The amendments in the Guidelines in this regard has been issued separately and are available at DoT website and also on https://lnkd.in/gyAR6BT.

Leave a Reply

instagram default popup image round
Follow Me
502k 100k 3 month ago
Share